Space supporting drinkware production, assembly, decoration, quality control and warehousing.
Factory & capability
Scale you can see.
Control you can verify.
A factory-integrated workflow for global drinkware programs—supported by production capacity, design engineering, quality checkpoints and project-specific compliance documentation.
Review the production stages and the quality questions to agree before ordering.
Explore manufacturing & quality →
A VISUAL LOOK AT MANUFACTURING
The spaces behind
a drinkware program.
Exterior, workshop and storage views from the reference film. Request current facility details and arrange a project-specific visit with Kenny.
Factory exterior
A view of the manufacturing site shown in the reference film.
Workshop & equipment
An overview of the equipment and production workspace.
Storage & dispatch
Carton storage shown in the same manufacturing film.
Manufacturing reference images: stills from the Alibaba-hosted GANGHONG film already featured on this website. These explain drinkware production and are not verified photographs of a ChenChen-owned facility.
Request current facility information →PRODUCTION, IN PICTURES
A closer look
at how a cup takes shape.
Follow the manufacturing journey visually. The exact routing, equipment and inspection plan depend on your selected model and agreed specification.
Design & specification
Start with drawings, construction, capacity and a clear product brief.
Sample & collection review
Review form, colors, lid operation and the approved sample.
Metal forming
Shape the metal body and control the critical dimensions.
Body processing
Prepare and join the inner and outer body components.
Vacuum processing
Create the insulated body; agree the thermal-performance test separately.
Surface preparation
Prepare the cup surface for the specified finishing route.
Coating & color
Develop the required color, surface feel and appearance standard.
Logo decoration
Apply artwork using a process suited to the model and project.
Assembly & packing
Complete assembly, inspection and packing to the order specification.
Manufacturing reference images: stills from the Alibaba-hosted GANGHONG film already featured on this website. These explain drinkware production and are not verified photographs of a ChenChen-owned facility.
Want to see the process for your own project?
Request photos, samples & specificationsMANUFACTURING REFERENCE FILM
Watch the process in motion.
The GANGHONG film illustrates forming, body processing, vacuum, finishing and packing. It is a manufacturing reference, not a verified ChenChen-owned factory tour.
Planned output capacity, subject to model complexity, finish, packaging and line schedule.
Skilled workers and supporting teams across production, quality, engineering and export service.
Experience supporting brands, importers, distributors and promotional buyers worldwide.
COMPANY PROFILE
One team from product concept through export delivery.
ChenChen Drinkware is based in Ningbo, China, a major manufacturing and logistics hub. We focus on stainless steel tumblers, vacuum bottles, mugs and lid systems for private-label and custom programs.
Our role goes beyond matching a picture to a price. We translate a buyer brief into a controllable specification: capacity, steel configuration, wall construction, lid and gasket, coating, decoration, packaging, inspection standard and shipment plan. That definition is carried from sample approval into mass-production records.
Market-led design
Trend direction, form language, CMF, logo placement and retail-ready presentation designed for North American and European channels.
- Concept sketches and visual direction
- 3D structure and lid architecture
- Prototype and usability review
- Private mold and tooling coordination
Production engineering
Specification decisions are translated into materials, processes, tolerances and checkpoints the production team can repeat.
- 201 / 304 / 316 material options
- Forming, welding and vacuum processes
- Powder coating and surface finishing
- Assembly, packing and export coordination
Decoration library
Finish selection is based on artwork, geometry, durability, volume, color accuracy and target cost—not just appearance.
- Silk screen and pad printing
- Laser engraving
- Heat and water transfer
- 3D UV and 5D visual-effect printing
Quality control
A control plan can be aligned with the approved sample, purchase specification and customer inspection requirements.
- Incoming-material verification
- Leak, vacuum and thermal checks
- Appearance and coating inspection
- Final sampling and packing verification
AUDIT & COMPLIANCE READINESS
Compliance programs buyers recognize.
Depending on the project and participating factory entity, we can support review against major social-compliance, workplace, security and customer-specific programs. Product compliance may also include food-contact and market testing such as FDA/LFGB-related requirements where applicable.
The logos identify programs we can support or have experience with; they are not a blanket certification claim. Audit availability, scope, factory name, grade and expiry date must be reconfirmed before order placement. Product testing is based on the final material, construction, color/decoration and destination market.
amfori BSCISocial compliance | SCANSupply-chain security |
Sedex / SMETAEthical trade audit | |
Intertek WCAWorkplace assessment | |
Walmart FCCAFactory capability | Customer programsRetailer-specific |
QUALITY GATES
Control the variables that control the cup.
- MaterialGrade, thickness, food-contact parts and supplier documentation
- StructureForming, weld integrity, rim, thread and dimensional fit
- VacuumProcess control, leak screening and thermal-performance sampling
- FinishColor, adhesion, artwork, appearance and wear requirements
- AssemblyLid operation, gasket placement, torque and leak check
- ShipmentAQL or agreed inspection, packing, carton marks and traceability
QUALIFY THE FACTORY FOR YOUR PROJECT
Request capability, audit or sample information.
Tell us the market, product, order volume and documents your customer requires.




